Audi A3

since 1997 of release

Repair and car operation



Audi A3
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Systems of cooling, heating
+ the Power supply system and production of the fulfilled gases
- Engine electric equipment
   + System of electronic control by ignition and injection
   - Charge and start systems
      Storage battery
      Removal and installation of the storage battery
      Check of the storage battery
      The generator - general information and security measures
      Check of the established generator
      Removal and generator installation
      Check and replacement of brushes of the generator and tension regulator
      Starter - general information
      Check of system of start of the engine
      Removal and starter installation
      Check, removal and installation of the traction relay of a starter
+ Manual box of gear shifting
+ Automatic transmission and models with a full drive
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Elektroskhema


38a8de3e

Removal and starter installation

REMOVAL

PERFORMANCE ORDER
Disconnect a negative cable (–) the storage battery at the switched-off ignition.
ATTENTION

Thereof information from electronic blocks of memory, such as, a radio receiver code is erased. Without a code the radio receiver can be included only by the manufacturer or HUNDRED AUDIS. Therefore familiarize with subsection materials Input of a code of a radio receiver.



Diesel engine


PERFORMANCE ORDER
1. Remove the storage battery, address to the subsection Removal and installation of the storage battery.
2. Unscrew bolts of fastening and remove the console of the storage battery (an arrow on an illustration).
All cars
3. Disconnect a wire–1–.
4. Rasstykuyte I will corrode – 2–and take out from the holder.
5. Disconnect a wire–4–and расстыкуйте I will corrode – 3–.
6. Take out wires from the directing.
7. Turn out the top bolt of fastening of a starter–1–.
8. Remove a shumopogloshchayushchy element in the center.
9. Disconnect the pressure head pipeline of the power steering from the holder (the shooter on the right on an illustration).
10. Turn out the bottom bolt of fastening of a starter–2–.
11. Take out a starter down.

INSTALLATION

PERFORMANCE ORDER
1. Establish a starter and fix it to a check point the moment of 65 N of m.
2. Fix the pipeline of pressure of the power steering the moment of 20 N of m.
3. Attach an electric wire of the plug 30 to a starter and fix the moment of 16 N of m.
4. Join the plug 30 socket.
5. Establish the central shumopogloshchayushchy element.
6. Diesel engine: Fix the console of the storage battery and establish the battery, address to the subsection Removal and installation of the storage battery.
7. Attach a weight cable (–) the storage battery. Attention: Make active high-rise automatic equipment of an electric window regulator, and also establish hours and enter a radio tape recorder code, address to the subsection Removal and installation of the storage battery and Input of a code of a radio receiver.